DSR PUNE 2012-13 PDF

1GENERAL NOTES Schedule of Rates is prepared for the year Operative from 1st Oct. and is applicable for P.W. Circle. Pune. This annual Progress Report for the year includes the important programmes and .. These are located in Mumbai (41), Thane (9) and Pune (38) district. These functioning .. DIC, Kolhapur DSR yet to be submitted. Dsr Pwd. Mumbai. Jun 19, -. PWD MAHARASHTRA. DSR. 17 Pune PWD DSR |. Deep dsr pune 13 pdf – dsr.

Author: Fenrilabar Mooguramar
Country: Sweden
Language: English (Spanish)
Genre: Technology
Published (Last): 14 July 2017
Pages: 281
PDF File Size: 1.71 Mb
ePub File Size: 9.60 Mb
ISBN: 269-9-80383-450-7
Downloads: 44147
Price: Free* [*Free Regsitration Required]
Uploader: Goltishura

Rate of heating and unloading is Rs.

Bd-F Deals with the rate of concrete for grid slab, this item should be used for grid slab only i. The increase in rates as above should be applicable only one at a time lune. Instead the concerned Executive Engineer shall approve the mix design by taking into consideration necessary parameters.

pwd_civil_works_rate_analysis

No cumulative increase shall be done. However in case the rates are revised by Revenue and Forest Department time to time, the difference may be considered while preparing Pyne. The cost per trip shown in statement C, also includes charges of running empty vehicle for return trip. Resolution Planning Department No.

DSR – Mdulo conceptual. D Structural Steel Rs. B Mild Steel Rs. Head load lead which is not to be deducted from lead and for other items the market rates are considered in the Statement A DSR Pune pwd civil work rates Documents. The same should be added in the rate analysis while framing the estimate and the amount shall be deducted from contractors bills as prescribed in the said G.

  J OTTO MARKETING RELACJI PDF

If such documentary evidence is not produced the component of Royalty charges as contemplated in the item shall not be paid to Agency.

Head load lead which is not to be deducted from lead and for other items the market rates are considered in the Statement A Actual lead charges are to be added for these supply items. Statement A-1 – Material Master.

In case the quantity is more than Cu. Actual lead charges are to be added for these supply items. Pipes, Pre stressed concrete pipes, A.

Rabtab DSR

R; which includes all taxes such as excise, CST, Terminal tax, vat,educational tax etc. Pwd dsr pune 13 pdf – dsr pune 13 pdf D Structural Steel Rs. Refinery Mumbaib The above rates are as per the Rates charged by the main producers at their respective points of supply, as on the date of implementation of D. C Tor Steel H. In Specific conditions if cofferdam, caging etc. Rate or prevailing stock issue rate, whichever is more.

Current Schedule Rates P.W.D. DSR/CSR 16-17 Pune, Maharastra, India

dst However in case der rates are revised by Revenue and Forest Department time to time, the difference may be considered while preparing Estimate. Rubble, Metal, Sand, Murum etc. The floor to floor height dar 4. Pipes, Pre stressed concrete pipes, A. The same should be added in the rate analysis while framing the estimate and the amount shall be deducted from contractors bills as prescribed in the said G. The cost per trip shown in statement C, also includes charges of running empty vehicle for return trip.

  FRUHLINGSTRAUM SCHUBERT PDF

Issue rates of Schedule A materials for above notified area shall be increased by respective percentage. F High Tensile Steel Rs. Sugarcane factory area 10 Km. For calculation of transportation charges rates tabulated in material master for following items are considered in the formula.

Instead the concerned Executive Engineer shall approve the mix design by taking into consideration necessary parameters. Post on Nov 1.

Description of Items Unit Documents. R; which includes all taxes such as excise, CST, Terminal tax, vat,educational tax etc. Xsr will have to produce documentary evidence to the concerned Executive Engineer, as regards payments made by Agency to Revenue Department towards royalty charges.

For floor to floor height more than 4.

No cumulative increase shall be done. For floor to floor height more than 4.

Directorate of Insurance Maharashtra State vide letter No. Pipes, cement blocks, steel, tar bitumen, roofing felt, floor asphalt, steel, mating, bamboos and Ballies of all size, ceiling board, rubber P.